2009 - 414.0 Pipefitter

Hour-based
ONET: 47-2152.00

4

Years

966h

Related instructions

8000h

On-the-job training
Curriculum
  • Math for Apprentices (APR 257)
  • Welding I (APR 151)
  • Welding II (APR 152)
  • Print Reading (APR 268)
  • Introduction to Metallurgy (APR 255)
  • Industrial Hydraulics (APR 252)
  • Pipe Welding Practices IV (PFW 269)
  • Pipe Trades Prep for Cert (PFW 235)
  • Welder Certification Plate & Pipe (PFW 255)
  • Pipe Fit-up & Field Welding I (PFW 220)
  • Pipe Fit-up & Field Welding II (PFW 221)
  • Pipe Trades Capstone (PFW 263)
  • First Aid / CPR
  • Fabrication/Structural Systems (WD4.255)
  • Layout Procedures (WD4.245)
  • Aluminum Welding I (WD4.281)
  • Fabrication/Appl Problem Solving (WD4.257)
  • Manufacturing Processes I (APR 161)
  • Electricity for Maintenance (APR 256)
  • Writing 115 or 121
  • Communication
  • Trade Specific Trainings
On-the-job training
  • Process Piping: Systems
  • Process Piping: Controls
  • Process Piping: Industrial
  • Process Piping: Power Plant
  • Process Piping: Boilers - High/Low Pressure
  • Process Piping: Steam and Hot Water Heat
  • Process Piping: Temperature and Pressure Control
  • Joining of Piping: Method and Techniques
  • Joining of Piping: Threading, Welding, Electric, Acetylene, and Soldering
  • Joining of Piping: Specialty - Poly Prop / Poly Welding
  • Joining of Piping: Air Conditioning and Refrigeration (High and Low Pressure)
  • Joining of Piping: Hydraulics
Interested in this apprenticeship?
Sign up to receive notifications about changes and updates about 2009 - 414.0 Pipefitter
Industries
calendar.svg
Get on our calendar
Not sure if WorkHands is right for you? Chat with our team today
sendEmail.svg
Send us an email
We'll get back to you shortly