Line Maintainer

Hybrid-based
ONET: 49-9051.00
RAPIDS: 0283

4

Years

51

Skills

1064h

Related instructions

7200h

On-the-job training
Curriculum
  • 1st Year NJATC
  • 2nd Year NJATC
  • 3rd Year NJATC
  • 4th Year Day School
  • Secondary School
  • Transformer Theory
  • Hotstick School
  • Hotstick Refresher - 2nd Yr
  • Hotstick Refresher - 3rd Year
  • Hotstick Refresher - 4th Year
  • 2nd Year Lineman Formal JPEs
  • 4th Year Top Out Testing - Lineman
On-the-job training
  • Basic Line Work Training, Proper Tool & Equipment Use, Safety Procedures, Field Schools
  • Transmission/Construction
  • Distribution/Construction (OH & UG)
  • Operations and Maintenance
  • Classroom Hours
  • PTO/STD/No-Pay/HOL/Sleep
  • JPEs - 1st Year (1-6 and 2-6 Step)
    • (AL-01) Set Wood Pole and Install Anchor and Guy Wire
    • (AL-02) Remove Wood Pole
    • (AL-03) Pull New Overhead Line (New Construction)
    • (AL-04) Pull Underground Cable
    • (AL-05) Install Pad Mounted Transformer (New Construction)
    • (AL-06) Install Pad Mounted Switching Cabinet (New Construction)
    • (AL-07) Terminate Single-Phase Secondary Cable in Meter Panel
    • (AL-08) Set A Single-Phase Meter On Customer Panel
    • (AL-09) Install Transformer on Steel Pole (New Construction)
    • (AL-10) Check Voltage and Rotation On A 3 Phase Transformer
    • (AL-12) Install a Span(s) Secondary
    • (AL-13) Repair Open Wire Secondary
    • (AL-14) Splice Conductors
    • (AL-15) Terminate Elbows
    • (AL-16) Terminate Terminators
    • (AL-17) Terminate T-bodies
    • (AL-18) Build Single Phase Transition Pole (New Construction)
    • (AL-58) Pole Top Rescue on the Wood
  • JPEs - 2nd Year (3-6 and 4-6 Step)
    • (AL-20) Cover Rubber Energized Primary Using A Bucket Truck using RPE Cover Energized Primary Bucket Truck
    • (AL-21) Replace Bell
    • (AL-22) Replace Crossarm with Primary Energized
    • (AL-25) Double Dead End A Single Phase Conductor
    • (AL-27) Pick Up A Contact Tag
    • (AL-28) Check Conductors For Correct Phasing
    • (AL-29) Check Amps On A Primary Circuit
    • (AL-30) Open A Switch With Load Break Tool
    • (AL-31) Install Open Delta 120-240-208 Transformer Bank (New Construction)
    • (AL-48) Release New Equipment From Construction To Operations
    • (AL-46) Hi-Pot a Cable
  • JPEs - 3rd Year (5-6 and 6-6 Step)
    • (AL-32) Change Taps In A Transformer
    • (AL-33) Replace NX Fuse In Dead Front Cabinet.
    • (AL-34) Set Up Bucket Truck and Operate Controls in Primary Area
    • (AL-35) Replace Overhead Fuse With Extendo Stick
    • (AL-36) Spread Overhead Conductors
    • (AL-37) Set Steel Pole Near Energized Conductors
    • (AL-38) Change Out A Disconnect Switch
    • (AL-39) Replace A Cutout On A Capacitor
    • (AL-40) Switch Overhead Capacitor Bank Out Of Service And Back In Service
    • (AL-43) Replace Underground Oil Switch On Capacitor Bank
    • (AL-44) Replace Underground Capacitor Can
  • JPEs - 4th Year (7-6 and 8-6 Step)
    • (AL-47) Pick Up And Release A Clearance
    • (AL-50) Remove Load Side Links in a Legacy Style Network Protector (CM52 or 14) Or Viso Rods
    • (AL-51) Open Close J-switch On Pad Mounted Switching Cabinet
    • (AL-52) Build A Three Phase 12000 Volt Transformer Bank
    • (AL-56) Build A Three Pot Transformer Bank
    • (AL-57) Replace Cut Out On 3 Phase Dip Pole
    • (AL-62) By Pass Regulator
    • (AL-63) Install Contact Tag
    • (AL-66) Replace Insulator on a Steel Pole
    • (AL-67) Install / Replace Recloser
    • (AL-68) Change Out 200 Amp Switch in Switching Cabinet
Interested in this apprenticeship?
Sign up to receive notifications about changes and updates about Line Maintainer
Website
State
calendar.svg
Get on our calendar
Not sure if WorkHands is right for you? Chat with our team today
sendEmail.svg
Send us an email
We'll get back to you shortly