Electrician Substation

Hybrid-based
ONET: 48-9051.00
RAPIDS: 0166

4

Years

57

Skills

1344h

Related instructions

7200h

On-the-job training
Curriculum
  • 1st Year Day School
  • 2nd Year Day School
  • 3rd Year Day School
  • 4th Year Day School
  • Conduit School - 1st Yr
  • Secondary School
  • Hotstick School
  • Hotstick School Refresher - 2nd Yr
  • Hotstick School Refresher - 3rd Yr
  • Hotstick School Refresher - 4th Yr
  • Print Reading - 1st Yr
  • Print Reading - 2nd Yr
  • Print Reading - 3rd Yr
  • Print Reading- 4th Year
  • Transformer Theory - 1st Year
  • 2nd Year Substation Electrician Formal JPEs
  • 4th Year Top Out Testing - Substation Electrician
On-the-job training
  • Basic Field Work Training and Proper Tool and Equipment Use and Safety Procedures, Transformer Connections Field School, Miscellaneous Shops
  • Substation Construction
  • Substation Maintenance (Hot & Cold)
  • Equipment Maintenance
  • Distribution Automation
  • Protection, Relays & Controls (P&C) Construction
  • Protection, Relays & Controls (P&C) Maintenance
  • Construction Maintenance (Cable Replacement, Splicing)
  • System Improvement (OH/UG)
  • Miscellaneous Departments
  • Subtech
  • Classroom - Day School ONLY
  • PTO/STD/No-Pay/HOL/Sleep
  • JPEs - 1st Year (1-6 and 2-6)
    • (AE-01) Hastings Meter
    • (AE-02) Boom/Bucket Truck
    • (AE-05) Dielectric Test
    • (AE-07) Make Gaskets
    • (AE-08) Make Jumpers
    • (AE-09) Multi Meter
    • (AE-11) Enter and Exit an Underground Vault
    • (AE-12) Oil Sample
    • (AE-13) Capacitor Can Replacement
    • (AE-35) Remove/Install Transformer Cooling Fan(s)
    • (AE-36) Set-up and Operate Deutsch Press or DMC
    • (AE-58) Elevating Work Platforms
    • (AE-59) Assemble a 69kV Switch
  • JPEs - 2nd Year (3-6 and 4-6)
    • (AE-06) DILO
    • (AE-14) Contact Tag
    • (AE-15) Ductor
    • (AE-17) High Pot
    • (AE-21) Switching Order and Clearance Pick Up & Release
    • (AE-30) Megger
    • (AE-33) TTR
    • (AE-39) Hang Substation Grounds
    • (AE-40) Change Out a 12KV Disconnect Switch
    • (AE-41) Replace an Arrestor
    • (AE-42) Splice Conductors
    • (AE-43) Terminate Elbows
    • (AE-44) Terminate T-Bodies
    • (AE-45) Terminate Terminators
    • (AE-46) Layout, Assemble, and Install Substation Breaker
    • (AE-47) Install Fuse in SM-5 Fuse Door
    • (AE-48) Replace Fuse on Cutout
    • (AE-60) Spiking Cable
    • (AE-61) Mobile Transformer
  • JPEs - 3rd Year (5-6 and 6-6)
    • (AE-04) Control Cable
    • (AE-10) Replace Nitrogen Bottle
    • (AE-16) Grounding Breaker
    • (AE-20) Switch Regulator Out of and Into Service
    • (AE-24) Phase in New Substation Equipment
    • (AE-26) Time Substation Breaker
    • (AE-32) Trip Coil
    • (AE-38) Calibrate a Regulator for Low Cylinder Nitrogen Alarm
    • (AE-49) Layout, Assemble, and Install 69 KV Get-Away Switch in Substation
    • (AE-50) Install Substation Transformer
    • (AE-51) Change out a Bushing on Transformer
    • (AE-52) Add Oil to Bushings
    • (AE-53) Check Underground Cable for a Fault (Hi-Pot Cable)
    • (AE-54) Release Equipment to Operations
  • JPEs - 4th Year (7-6 and 8-6)
    • (AE-19) SF6 (Adding Gas)
    • (AE-27) Vacuum Switch Schematic
    • (AE-28) Voltage Regulator Control Settings
    • (AE-31) Set and Calibrate IAC relay
    • (AE-55) Assemble and Install Substation Capacitor Bank
    • (AE-56) Remove Load Side Links in a Network Protector OR Remove Load Side Links in a Legacy Style
    • (AE-57) Operational Test Vacuum Switch on a Network System
    • (AE-62) SF6 (Low Pressure/Lockout Alarm)
    • (AE-63) Viso Blocks
    • (AE-66) ADMO Switches
    • (AE-67) Baron Unit
Interested in this apprenticeship?
Sign up to receive notifications about changes and updates about Electrician Substation
Website
State
calendar.svg
Get on our calendar
Not sure if WorkHands is right for you? Chat with our team today
sendEmail.svg
Send us an email
We'll get back to you shortly